Brunel Swivel Bridge Project Photos June 2018
Page contents
Investigative Work in 2018
![Brunel Swivel Bridge](images/3_d_image.jpg)
2018 investigative work is on the rotation of the bridge
June 2018
Investigating the wheels and bearings. Rotor Wheels photosThis time the South West.![]() Bob and Maggie checking the level of the west wheels |
![]() Geoff using the needle drill on the ring |
![]() Tiring work |
![]() surface much improved |
![]() Grinding the sides looks more relaxing- certainly the tool is lighter |
![]() A filthy job! |
![]() Julian applying heat to free off the rusted nuts holding down the bearings, having lifted the wheel with the chain -hoist to extract all the packers. |
![]() Ian helping Julian undo the nuts |
![]() Ian and Maggie watching Julian |
![]() lots of rust on the floor which Maggie cleared up |
![]() Ian turned his attention to painting the shed |
![]() Shed looks a lot brighter |