Investigative Work in 2018


Brunel Swivel Bridge

2018 investigative work is on the rotation of the bridge

Details of work

Details of progress in 2013

Details of progress in 2014

Details of progress in 2015

Details of progress in 2016

Details of progress in 2017

Details of progress in 2018

March 2018

Investigating the wheels. Rotor Wheels photosThis time the North East.
Everyone wearing woolly hats to keep warm
Brunel Swivel Bridge
The south-east wheel has recently been machined, showing our wheel in a giant lathe at Croft Engineering in Fishponds, with machinist Paul Tyrer.
Brunel Swivel Bridge
Maggie and Julian trying to get the bronze shell out of the housing, the other Julian filming.
Brunel Swivel Bridge
Julian taking the cap off the noth west housing.
Brunel Swivel Bridge
David and Bob starting to lift the north east wheel
Brunel Swivel Bridge
Wheel needs a good clean
Brunel Swivel Bridge
There is very little room to manoevre
Brunel Swivel Bridge
The hook gets in the way of the turntable. There is no room to put the wheel at an angle to get past. Time for a rethink
Brunel Swivel Bridge
Bob gets the wheel lifted finally with Martyn and Ian's help and a long crowbar.
Brunel Swivel Bridge
Just look at the cobwebs in the wheel
Brunel Swivel Bridge
Bob directing the next operation
Brunel Swivel Bridge
David putting scaffolding pole under the gantry ready to move the wheel
Brunel Swivel Bridge
Geoff moving the wheel
Brunel Swivel Bridge
Manoevring the wheel at an angle to get to the Youngmans board going diagonally
Brunel Swivel Bridge
Brunel Swivel Bridge
Need to walk the plank to get to the meeting of the Youngmans boards
Brunel Swivel Bridge
Martyn on the wire brush, David on the needle gun, cleaning the wheel
Brunel Swivel Bridge
wheel going back into Geoff's car
Brunel Swivel Bridge
Ian Kerr with his Meccano and polystyrene model of the 'setting gear' which sets the Bridge deck at the
correct level on the north bank of the Entrance Lock.
His Meccano model of the bridge itself was on show at the Model Engineering show August 2016