Brunel Swivel Bridge Project Photos March 2020
Page contents
Investigative Work in 2020
2020 investigative work is still on the rotation of the bridge
March 2020
Floods
High tide 12 March |
Upto base of bridge |
BOB from above |
well the tops of the bollards show where the lock gates were |
the container by the shed has moved! |
BOB from the southern side |
checked bearings after flood |
the copious quantity of grease we applied last year had done its job of excluding water and protecting the iron/steel shafts. |
glued back in place the damaged corner of one ram-flange |
Maggie exercising by helping to put ram pit cover back on |