Brunel Swivel Bridge Project Photos March 2020
Page contents
Investigative Work in 2020

2020 investigative work is still on the rotation of the bridge
March 2020
Floods![]() High tide 12 March |
![]() Upto base of bridge |
![]() BOB from above |
![]() well the tops of the bollards show where the lock gates were |
![]() the container by the shed has moved! |
![]() BOB from the southern side |
![]() checked bearings after flood |
![]() the copious quantity of grease we applied last year had done its job of excluding water and protecting the iron/steel shafts. |
![]() glued back in place the damaged corner of one ram-flange |
![]() Maggie exercising by helping to put ram pit cover back on |